MNDOT has finally announced the design for the replacement bridge over the Mississippi in Hastings. It’s an arch-style bridge, repeating the past two river bridge designs.
The design cost came out about $100 MILLION lower than the MNDOT estimate. I suspect this is because the arch isn’t quite as huge as we might have expected. I think the proposed appearance looks fine.